Even before starting Blue Ocean Projects with his partners, Mike Sizeland was completing and assisting in other projects.


Blue Attraction (Amels 1982).
Mike was engineer on board during the extensive refit with hull extension completed in 1995. This made
the decision easy for the Captain at the time to make in choosing to use Mike as project engineer
and he oversaw all engineering works onboard, problem solving existing technical issues and assisting
the Captain with the new bridge layout.

Blue Bird (Astilleros 2006)
Mike was called in at a late stage in the project to assist with various aspects of this award winning project.

Big Change (Protestan Turkey 1982)

Now classed as a new build by flag authorities this has been the debut for Blue Ocean
as Super yacht Project Managers. She is being built to ABS Class and MCA Bermuda
and will be certified as a commercial vessel. The vessel’s hull has been extended with
a stern tender garage and swim-platform by 6 meters. Bridge deck re-modeling, for this the
wheelhouse was removed, to make it full width and extended. Sundeck was completely re-designed
with the bridge structure, including radar arch and mast. We also incorporated late into the project
a completely new structure for the owner’s cabin on main deck. The technical specification
for this vessel reads as any top yards equipment list would read:
New Caterpillar engines and generators
New electrical distribution system designed and by E’tech
Quantum zero speed stabilizers
Novenco flexi fog fire fighting system
Marquip exhaust systems
Hamaan sewage treatment with jets vacuum toilet system
Hem supplied watermakers.
Air conditioning supplied by webasto
Fully integrated AV system with central racks, vsat, voip phone system, crestron controlled AV system
with central movie and music library.


Visita nuesto Facebook ! ® Blue Ocean Projects S.L. - Tel: + 34 609 353 656
+ 34 650411688